MOISTURE MITIGATION

GET FROM NEW POUR TO NEW FLOOR IN AS LITTLE AS 8 DAYS!
(Koster® Process)

Is vapor drive / moisture delaying your floor installation project? No Surprises! No delays! You're in Control!

Start installing your new floors in as little as 24 hours from application of moisture mitigation system.

Moisture penetration through concrete slabs can cause severe problems for subsequent flooring systems.

High concentrations of moisture and alkalinity (levels determined through testing) can lead to the deterioration of flooring adhesives and delamination of coatings by osmotic action. Even with relatively low moisture emissions (MVER), elevated alkalinity can compromise even the toughest flooring system adhesives.

To avoid this problem the concrete slab should be primed with a material that will tightly bond to the concrete under these very adverse conditions.

For your next floor prep/removal or waterproof project in Chicagoland and the Midwest, you need the right team to move your job forward.